Rolling Road Resources provided an update from a maiden drill campaign at its Uvbergs project in Bergslagen. All five holes intersected orthomagmatic nickel mineralization, including e.g. 6.7m @0.32%Ni, 0.14% Cu, 0.12% Co and 0.16g/t 3PGE. The ore horizon and mineralization are open at depth and along strike in both directions and geophysical downhole surveys additionally indicate continuity at depth as well as several off-hole conductors. The company plans to commence an expanded drilling and geophysical program as soon as a go-public transaction is completed between Q4 2022 and Q1 2023.
Magmatic Ni-sulfide mineralization from the Uvbergs project (Source: LinkedIn/Plethora Private Equity Fund)