Gungnir Resources announced its highest-grade nickel intercept from Lappvattnet to date. Drill hole LAP22-25 returned 18.28m @ 1.49% Ni, including 5.76m @ 4.04% Ni. The hole was drilled in a 50m gap in the central part of the deposit, between historic holes LAP74292 and LAP76008, with the intersection potentially representing a zone of structural thickening. Additional results from the central part of the deposit are expected to be reported in January to early February.
Drill Hole LAP22-25, Lappvattnet (Source: www.gungnirresources.com)