Kingsrose Mining reported the final assay results from its 2024 drilling campaign at the Råna project in Norway. Three drill holes for a total of 706 meters tested a previously undrilled zone of outcropping massive sulfides, with two holes intersecting nickel sulfide mineralization returning for example 13.8m @ 0.4% Ni, 0.1% Cu and 0.04% Co in drill hole 24RAN009.
Cross Section through drill holes 24RAN008 and 24RAN009 at the Rånbogen prospect (Source: www.kingsrose.com)