European Green Transition reported the final results from its maiden drilling campaign at the Olserum REE project in southern Sweden. Returning for example 22.5m @ 0.58% TREO, including 2.45m @ 2.71% TREO (33.4% HREO), the final batch further confirmed the company’s exploration model, of multiple, locally high-grade, mineralized structures being present at the project.
Cross section along drill holes OLS24-07 and OLS 24-08 through the Djupedal prospect (Source: www.europeangreentransition.com)