Talga Group reported new drill results from its “Niska Link” target, connecting the Niska South and Niska North graphite deposits. Results from the first 13 holes testing the 2km long trend returned wide and high-grade intercepts, e.g. 84m @ 20.2% Cg, including 37m @ 29.6 % Cg in drill hole NIS22005 or 103m @ 17.9% Cg, including 43m @ 20.2% Cg in drill hole NIS22006. According to the company, the remaining assays are expected in August with a subsequent Vittangi resource update scheduled for later this year.
Vittangi Graphite Project, “Niska Link” collars over EM conductors(Source: www.talgagroup.eu)