Gold Line Resources reported initial results from 2022 drilling at the Paubäcken project in northern Sweden. Assays for 2022-AID-001, the first hole of the 2022 campaign, returned 14.55m @ 2.44g/t Au, including 0.85m @ 9.6g/t Au and 1.1m @ 9.14 g/t Au. The intercept represents an approx 50m step out below a previous high-grade intercept of 22.5m @ 2.4g/t Au in drill hole PAU-21-003. Drilling for up to 1500m is currently ongoing and aims to better understand the controls on the intercepted high-grade zones as well as to test over 800m of a previously identified 5km long structural corridor.
Aida target with collar locations, highlighted assay results and structural interpretation (Source: www.goldlineresources.com)