Amaroq Minerals reported results from its 2023 exploration drilling program at the Nalunaq project in southern Greenland. Testing the mountain block area in the vicinity of future planned mining activities, drilling returned the highest-grade gold intersections from the main vein to date, with drill hole NAL2305 returning 0.69m @ 182g/t Au.
Notably, the drilling program further resulted in the discovery of an additional vein (“75 Vein”) in the hanging wall to the main vein, with intersections as high as 0.5m @ 256g/t Au in drill hole NAL2305. Results for two additional sampled intersections of the 75 Vein are currently pending.
“Schematic cross section illustrating the location of the 2023 drilling and its results” (Source: www.amaroqminerals.com)