Endomines reported final exploration results from 2023 diamond drilling at its Kuittila project. Final assays from the 33-hole, 5072m drilling program returned e.g. 8.6m @ 1.8g/t Au, including 0.9m @ 5.7g/t Au and 0.9m @ 6.3g/t Au in drill hole KT-026 or 7.3m @ 2.1g/t Au, including 1.0m @ 9.1g/t Au in KT-022. Notably, the deposit is still open in multiple directions, with a follow-up deep drilling program aiming to test the depth extension of the system scheduled to commence at the end of January.
Kuittila 2023 and historic drilling (Source: www.endomines.com)