District Metals reported assay results from the spring 2022 drilling program at its Tomtebo project in central Bergslagen. Targeting the down plunge continuation of a massive sulfide lens at the Steffenburgs zone, drill hole TOM-22-038 intersected 25.5m @ 8.2% ZnEq, including a continuous massive sulfide interval returning 15.8% ZnEq over 3.6m and a bonanza grade gold interval returning 384 g/t Au and 855 g/t Ag over 0.4m (Capped to 10g/t Au for the ZnEq calculation). The company notes that the lens is open at depth and partially along strike.
Cross section though the Steffenburgs zone (Source: www.districtmetals.com)